|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
I really like this manual and it's reliable.I found and bought easly.thank you.
 ;
Thank you very much. the Instruction corresponds to my expectations. Sent it in time. I don't regret that paid money.
 ;
Good quality. Quick service. I recommend to everyone.
 ;
Very good quality scan of the document. I am very pleased with what I got.
 ;
PDF Contains
Technical Data, Mechanical data, Detailed Circuit diagram with components value, PCB layout. Actual PCBs Print. Component List, Spare parts code list and Input output detail. It cover LBB1211, LBB1212, LBB1213, LBB1216, LBB1217.
It is the actual Service Manual for SQ10
14GT15 14GT20
PURITY ADJUSTMENT
No. Adjusting point 1 PURITY ADJ. Adjusting procedure/conditions 1. Receive the GREEN-ONLY signal. Adjust the beam current to about 500 µA. 2. Maintain the purity magnet at the zero magnetic field and keep the static convergence roughly adjusted. 3. Observe the points a, b as shown in Fig. 4-1 through the microscope. Adjust the landing to the A rank requirements. 4. Orient the raster rotation to 0 eastward. 5. Tighten up the deflection coil screws. » Tightening torque: 108 ± 20 N (11 ± 2 kgf) 6. Make sure the CRT corners landing meet the A rank requirements. If not, stick the magnet sheet to correct it. Note: This adjustment must be done after warming up the unit for 30 minutes or longer with a beam current over 500 µA. Waveform and others
a
b
Fig. 4-1
A
B A=B
Fig. 4-2 Rank "A" (on the right of the CRT)
A
B A=B
Fig. 4-3
Rank "A" (on the left of the CRT)
12
|
|
 |
> |
|