There are currently no product reviews.
 ;
Very helpfull information and I highly recommend this source for needed information about your products.
 ;
More than pleased with my prurchase, very good product for the price.
 ;
This is a good quality scan of the service manual which includes an assembly diagram, block diagram, schematic, and parts list. Exactly what is needed to repair my KR-V55R receiver.
 ;
Excellent concise manual. All needed information was included. Typeface and diagrams were clear. Very fair price considering what others are charging. Many thanks
 ;
Response is a little slow- I had to wait 12 hours to receive download link but it says that it may take up to 24hrs.
Manual is old and was not produced in PDF- scanned copy is exellent.
Overall- value for money- I recommend
ALIGNMENT PROCEDURES OF MECHANISM
[ 14PV120/07, 14PV125/ ( 01, 07, 39, 58 ), 14PV225/ ( 01, 07, 39, 58 ), 14PV422/ ( 01, 07, 39, 58 ), 14PV425/07 ]
The following procedures describe how to align the individual gears and levers that make up the tape loading/unloading mechanism. Since information about the state of the mechanism is provided to the System Control Circuit only through the Mode Switch, it is essential that the correct relationship between individual gears and levers be maintained. All alignments are to be performed with the mechanism in Eject mode, in the sequence given. Each procedure assumes that all previous procedures have been completed. IMPORTANT: If any one of these alignments is not performed properly, even if off by only one tooth, the unit will unload or stop and it may result in damage to the mechanical or electrical parts.
Alignment 1 Loading Arm (SP) and (TU) Assembly
Install Loading Arm (SP) and (TU) Assembly so that their triangle marks point to each other as shown in Fig. AL2.
Alignment 2 Mode Gear
Keeping the two triangles pointing at each other, install the Loading Arm (TU) Assembly so that the last tooth of the gear meets the most inside teeth of the Mode Gear. See Fig. AL2.
Triangle Marks Alignment 1 Loading Arm (SP) Assembly Last Tooth Alignment 2
Alignment points in Eject Position
Loading Arm (TU) Assembly
Top View
Most inside teeth of Mode Gear Mode Gear Alignment 3
Fig. AL2
Alignment 3 Cam Gear (A), Rack Assembly
Install the Rack Assembly so that the first tooth on the gear of the Rack Assembly meets the first groove on the Cam Gear (A) as shown in Fig. AL3.
Top View Cam Gear (A)(HI) Alignment 3
Bottom View
Alignment 1 First tooth
Alignment 2
Fig. AL1
First groove Gear on Rack Assembly on the Cam Gear (A)(HI)
Fig. AL3 2-4-17 T6410APM
|