This is a good quality scan of the Operation & Maintenance (Service) Manual for the PAL version of this high-band broadcast umatic, BVU-800P
All schematics and lineup procedures appear to be included in this one manual AFAICT.
The file size is just over 113 MB which gives an idea of the quality and number of pages.
All of the schematics, which contain some fairly small print, are easily readable when you zoom into the page.
John Thompson, Newcastle Upon Tyne, England.
 ;
Good quality, all schematics of few of models. There is also short form of user manual and regulation manual.
 ;
Perfect copy of the service manual. you can enlarge every page, and it comes up
with all details.
 ;
It´s very very nice manual with all, what i need. Original in good quality. Very fast business. Very much thanks...
 ;
Purchased the manual that I was looking for at a great price and could download it easily.. Great service experience and for future purchases I plan to use the site.
Thank you very much
PURITY CONVERGENCE ADJUSTMENT
NO. Adjustment part Adjusting procedure conditions Waveform and others
PURITY ADJ. GREEN-ONLY Adjust 1 CONVERGENCE 1. Receive the "Crosshatch Pattern" signal. BGR
beam current to ~ 700 µA. ADJ. 2. Using the remote controller, call NORMAL
R 3. Maintain purity magnet at the zero magadjustment.) Static convergence
2. Degauss CRT enough with the degausing (To be done mode. B
coil. a b G after the purity
4. Observe the points a, b, as shown in Fig. 1-1 colours. Fig. 1-1 A rank requirement. angle in order to superpose the green colour
G
netic field and keep static convergence 1. Turn the 4-pole magnet to a proper opening roughly adjusted. angle in order to superpose the blue and red Fig. a
RGB through microscope. Adjust the landings R 5. Orient raster rotation to 0 eastward. over the blue and red colours.
2. Turn the 6-pole magnet to a proper opening
6. Tighten up the deflection coil screws. B
» Tightening torque: 108N ± 20 N Dynamic convergence
7. Make sure CRT corners landing meet screen in the following steps. Fig. b
(11kgf ± 2 kgf) 1. Adjust convergence on fringes of the A
B
A rank requirements. If not, stick magnet RGB a) Fig. a : Drive the wedge at point "a" and sheet to correct it. B swing the deflection coil upward. G Note:This adjustment must be done after b) Fig. b : Drive the wedge at point "b" and "c" R warming up unit for 30 minutes or and swing the deflection coil downward. longer with a beam current over 700 c) Fig. c : Drive the "c" wedge deeper and
A = B µA.
swing the deflection coil rightward. Fig. 1-2
R G
* For following colours press R/C RGB key to d) d : Drive the "b" wedge deeper and Fig. c
(on right of the CRT)
change. Rank "A" swing the deflection coil leftward. BGR 3. Apply lacquer to the deflection yoke lock screw,
A
2. Fix all wedges on the CRT and apply glass tape over them. B magnet unit (purity, 4-pole, 6-pole magnets) and magnet unit lock screw. Fig. d Green-only Blue-only Red-only
7
B on the screen.
Finally received the Red-only and Blue-only signals to make sure there is no other colours Wedge "a"
screen cleared
A = B
Signal-colour About 100°
4-pole magnet 6-pole magnet CRT neck Fig. 1-3
Lacquer
(on left of the CRT) Wedge
Rank "A"
"b" "c"
* Press R/C RGB key for 1 second in NORMAL MODE, the colLacquer our will change to RGB mono Purity magnet colour mode.
20mm
21GT-22
7-1 7-2
|
|
 |
> |
|