|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
I received the manual in correct time. It was a perfect help for me.
 ;
excellent quality, contains circuits and scan quality, 226 pages
 ;
Great price for the manual and easy to locate on the site and download. I would buy again.
 ;
Very good copy of Manual, clear and easy to print off, arrived very promptly and reasonably priced. Thanks, I will use you again
 ;
The service manual when downloaded and printed out was clear and easy to read. The manual is complete with the schematic diagram and technical data. I occasionally require a manual and now having registered with this company I shall order from them in the future.
Aufstellen
8mm
Ha Hb Hb Abb. 12
PR168
PR167
Abb. 14
Abb. 12: TŸr des GerŠtes und die des Mšbels um ca. 90¡ šffnen. WinkelstŸcke (Hb) auf die TŸrmitnehmer setzen (Ha). GerŠte- und MšbeltŸr aneinander halten und die Lšcher an der GerŠtetŸr markieren.
Abb. 14: WinkelstŸcke (Hb) wieder auf die TŸrmitnehmer (Ha) setzen und diese mit den beiliegenden Schrauben (I) fixieren. Zur eventuellen Ausrichtung der MšbeltŸr den Spielraum der Langlšcher benutzen. Nach Abschluss der Arbeiten das exakte Schlie§en der TŸren ŸberprŸfen. Achtung! Zwischen MšbeltŸr und Umbaumšbel einen ca. 2mm Luftspalt sicher stellen, damit die GerŠtetŸr einwandfrei schlie§en kann. Darauf achten, dass die GerŠtedichtung gut schlie§t (siehe Kapitel �GerŠtedichtung�).
8mm
K Ha
PR167
Abb. 13
Hb
Abb. 13: WinkelstŸcke (Hb) abnehmen. Befestigungslšcher mit Nagel (K) ankšrnen und durchstechen.
Hd
PR167/1
Abb. 15
Abb. 15: Die Abdeckung (Hd) in das WinkelstŸck (Hb) eindrŸcken, bis sie einrastet.
12
|
|
 |
> |
|