|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
The quality of this manual is good. It has all schematics and setup information for both the MDS-B3 and the MDS-B4. The scan quality is quite good, all pages are readable, This service manual also contains scans of the operating instructions from the User manual.
 ;
Quick site processing. A complete and very useful manual with all details. Thank you!
 ;
Das Service Manual war von der ersten bis zur letzten Seite sehr informativ und hilfreich. Die Darstellung aller Teile war klar und der Text gut lesbar.
Vielen Dank, das war nicht der letzte Download bei ownner-manuals.com.
 ;
It's a grate service manuals.Have many details and the writing it's so clear.You have all you want in manual,nothing missing,belive me.I'm verry satisfied of this manual.
 ;
Great scanned service manual
Usefull informations.
I will buy again!
Best Regards
Exchange of LBE, LBF board
1 2 3
(Photo 1)
(Photo 2) 1. Remove the screws in order of 1-3-2 from heat sink and then get rid of heat sink. (Photo 1) 2. Remove the TPC, FFC and power cable from the connectors. 3. Remove all of the screws from defected board. 4. Remove the defected board. 5. Replace the new board and then screw tightly. 6. Get rid of the foreign material from the connector. 7. Connect the TCP, FFC and power cable to the connector. 8. Reassemble the TCP heat sink. 9. Screw in order of 2-1-3. (Photo 2) If you screw too tightly, it is possible to get damage on the Driver IC of TCP.
Exchange YB and YM board
1. Separate all of the FPC connector of YB. (Photo 1) 2. Loosen all of the screws of YB and YM. 3. Remove the board from chassis. 4. Remove the connector of CN5004, CN5011, CN5012 among YB and YM. 5. Remove the YB from Y-main.
2-4-5
PZ3PDMDA
|
|
 |
> |
|