|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
Great price for the manual and easy to locate on the site and download. I would buy again.
 ;
Very good copy of Manual, clear and easy to print off, arrived very promptly and reasonably priced. Thanks, I will use you again
 ;
The service manual when downloaded and printed out was clear and easy to read. The manual is complete with the schematic diagram and technical data. I occasionally require a manual and now having registered with this company I shall order from them in the future.
 ;
Great manual, great price. I am very pleased with Owner-Manuals.com, quick service, fast communication. Will definitely use this site again.
 ;
Hello from Germany - thank you very much for the manual for my Sharp "Searcher" - the handling of your internet area is outstanding..Mike
Installing the Cabinet in a Window
s s
Handle air conditioner with care. Be sure your air conditioner cabinet does not fall out of the opening during installation or removal. The place where the power cord exits the air conditioner should be no more than 4 ft (122 cm) from a grounded outlet. Do not block the louvers on the front panel. Do not block the louvers on the outside of the air conditioner.
8. Pull cabinet part way out of window. Attach right filler board to front of a side-mounting angle with two ¹�� in. hex-head screws.
s
s s
2 1
Filler board installation
1. Center empty cabinet in window. Maintain a firm hold on the air conditioner cabinet. Lower window sash to hold cabinet in place. 2. Measure the distance between the right side of the cabinet and the inside of the window channel. 3. Repeat for the left side. 4. Adjust the cabinet until the distance on each side is the same. Then add ¹�� in. (3.2 mm) for the final measurement to be used in the next step.
3
1. Right filler board 2. Side-mounting angle 3. ¹�� in. hex-head screw
Top View
9. Place cabinet back into the window with right filler board tight against window channel. Insert left filler board into window channel.
1 2 1 Top View 3 2
1
1. Window sash 2. Empty cabinet 3. Window channel
2
1. Right filler board 2. Window channel
5. Use final measurement to measure in from each edge of the filler board. Mark lines in such a way that the outside edges of the filler board will contain the screw holes. 6. Place cardboard or other protective material on a sturdy, flat surface. Position filler board on top of the protective material to keep from cutting into the surface below. 7. Place a ruler or straight edge along the lines drawn previously and use a utility knife to cut filler boards to size along the lines. Make cut so the outside edges of filler boards will have screw holes.
10. Push left filler board against side-mounting angle and attach with two ¹�� in. hex-head screws. From the outside, push filler boards as far forward in window channels as possible.
Foam block installation
1. Measure the distance between the channel edge and the filler board. 2. Cut foam blocks ¹�� in. (6.4 mm) wider and insert into channel behind filler boards. Top View
1
3
2 3 4
1
1. Filler board 2. Window channel 3. Foam block
2
1. Lines 2. Screw hole
3. Long edge 4. Short edge
7
|
|
 |
> |
|