|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
the big video recorder format s-vhs many features delicate in loading system of the cassette. Such machines are no longer manufactured, it would be too expensive.
 ;
THIS MANUAL IS VERY GOOD AND VERY CLEAR
PLEASE NOTE IT DOES NOT CONTAIN THE SETUP INFORMATION TO ALIGHN THE GEARS IN THE CD MECH IT DOES SHOW ALL THE PARTS AND THEIR LOCATIONS .
 ;
Complete service and operation manual. All schematics are there, all circuit boards AND add-on boards. Including exploded views ,component names and specifications. Also electrical and mechanical adjustment procedures are in this manual. This manual also covers the more advanced BR-S811E unit. Scan quality is fair and usable.
 ;
High quality scan of original Service Manual. Everything´s fine!
 ;
Good scan of the original service manual. All schematics and adjustment procedures are there. It helped me to fix a long lasting problem with the tracking circuitry. The manual also includes the supplementals 1,2 and 3. Included are; electrical schematic's , pcb layout's, mechanical drawing's and exploded views, disassembly manual and maintenance procedures. 236 pages.
VL-AH50S/H/E/EW/EX
4-3-4. Checking and adjusting the tension pole position
(1) Check When winding of P5-120 tape is started, check whether the tension pole is in the specified position against Si roller as shown or not. If it is not in the specified position, remove the cassette and adjust the position in the following procedure. (2) Adjustment 1. Don�t set up any tape, and select the PB mode. (Refer to Item 4-5-1-(4).) 2. Slightly loosen the screw (a) (to such a strength as the T band holder B can be moved). 3. If the tension pole is in the inner position than specified, dislocate the T band holder B in the arrow (A) direction and if it is in the outer position, dislocate it in the arrow (B) position. Then, tighten the screw (a). (For reference, dislocate it 0.4 to 0.8 mm outer from the position specified above.) For the position adjustment, it is convenient to use the position adjustment screwdriver (JiGDRiVERMX7U2). (Set it in the hole (C).) 4. Check the position in the �(1) Check� procedure described above. 5. If it is not in the specified position, repeat the adjusting procedure 1 thru 3. Note: � Tightening torque of screw (a) 70 mN·m � To check the position, be sure to run the tape. � If the cassette compartment assembly is removed, it makes the work easier. (Refer to Item 4-5-3.)
3 � 0.5 0 Si roller
Tension pole
Hole (C)
(B) (A) Screw T Band (a) Holder B
4-3-5. Checking the take-up torque for rewind playback (VS-REW)
(1) Remove the cassette compartment ass'y and set to the sensor OFF mode. (2) Set the torque gauge (JiGTG0045) on the S reel disk, and check in the rewind playback (VS-REW) that the torque at the supply side is within the specified range. Standard of take-up torque in rewind playback (SP mode) 31 ± 5 g·cm with ripples less than 5 g·cm. (If the torque ripples appear, read the center value of torque between the ripples.)
4-3-6. Checking the back tension torque for rewind playback (VS-REW)
(1) Set the torque cassette (JiG8T-032) in position, and check in the rewind playback (VS-REW) mode that the torque at the tape take-up side is within the specified range. Standard of back tension torque in rewind playback (SP mode): 14 ± 5 g·cm with ripples less than 5 g·cm (If the torque ripples appear, read the center value of torque between the ripples.)
13
|
|
 |
> |
|