|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
Quality scan of the actual service manual, just what I was looking for.
 ;
Straightforward ordering process. Service manual scan was clear & easy to read. Very comprehensive instructions for alignment. Excellent, thank you.
 ;
Fast, clear and useful. Important for me: the manual is in German.
 ;
Very good quality. Some parts are not fully readable, but the fundamental ones are fine.
 ;
very good quality readable manual,printed off very well.
1-1. DVS-7000A 1-1-3. Inserting/Pulling Out of Plug-in Boards 1-1-4. Capacitor for Data Backup
Removal (3) Open the eject levers of the plug-in board in the direction of the arrow 1. (4) Pull out the plug-in board from the unit. n Pull out the plug-in board with an equal force for both eject levers. Installation (5) Insert the plug-in board along the board guide rails while opening the eject levers in the direction of the arrows 1. (6) Connect the plug-in board to the connector on the mother board by putting the eject levers in the direction of the arrow 2. (7) Install the two board retainer and the one board holder in the reverse order of the procedures (1) and (2).
Eject levers
1
2
MB-618 board
1
2
Board
Board guide rail
1-1-4. Capacitor for Data Backup
To store a setup data and a real-time clock, the large storage capacitor (3 Farad) is mounted on the CPU264A board. To charge the large storage capacitor sufficiently, turn on the power of DVS-7000A for more than about thirty minutes. The sufficiently charged large storage capacitor enables data to be stored for about one week in the normal temperature.
DVS-7000AE MMP1
1-5
|
|
 |
> |
|