|
There are currently no product reviews.
 ;
Great value, good scan, just as expected, everything that you need.
 ;
Good scan, great price, but almost the same with the SV260 service manual.
 ;
This PDF is very comprehensive. It includes drawings, parts lists, schematics, pictures, PCB drawings, mechanical layouts, etc. for all three stackable equipment. The scans are good too. Easy to read and no smudges or black lines. I have no complaints. I will make this site my first stop for finding my service manuals.
 ;
This service manual includes drawings, schematics, exploded views, parts list, operating details, and more. Very good scans, very readable. The only thing that made it a 4 star rating was on approximately 4 scans only half of the page was scanned then the other half. I would have preferred the pages to be whole scans.
 ;
Good manual contains all it takes to update, repair,these types of mixers.Thanks.
HOW TO OPEN THE DISC TRAY WHEN POWER SWITCH TURNS OFF
Insert a tapeing driver into the aperture of the unit bottom, and turn in the direction of arrow (to OUT direction.) * To close the disc tray, turn the driver in the reverse direction(to IN direction).
NI
OU T
Tray
NOTE FOR MAIN GEAR INSTALLATION
5 Rotate the MAIN GEAR until the portion that has no gears, of the MAIN GEAR is aligned with the shaft of the GEAR (REV). Then insert the GEAR (REV). 6 Stopper washer (5)
Projected portion
3 Install the MAIN GEAR while aligning the protrusion of the MAIN GEAR to the cut-off of the ENCODER. 2 Set the cut-out of the ENCODER to the right when viewed from the front view. A
1 Rotate the GEAR (U/D) to the arrow A direction.
SHAFT
B
Front view
B 4 Open the SET LEVER and LOCK LEVER in the direction of the arrow B, and push in the MAIN GEAR.
�4�
|