|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
reasonable price for the schematic - the service is perfect, all as expected and pointed by instructions - good scan of the original plans - thank you!
 ;
Manual was just as described!!! I odered it and in less than a day was able to download it and the text was clear and pages were all complete just as the original manual was. Purcashed this for a friend and they were more than happy. Perfect all around!
 ;
Excellent service and prompt delivery. But it's not a manual - only 4 pages wiring diagrams.
Thanks.
 ;
The manual I purchased was exactly what I needed to repair my Toshica television. The manual contained schematics and troubleshooting information that was very helpful.
 ;
Il download del Service Manual JVC HR 4100 non é stato eseguito
CDX-FM1277,FM1279
12. To see the amount of dislocation, place the mechanism upside-down. If the stopper bend has been dislocated in the direction of the first CD, turn VR802 to the left(Fig. 2). To lower the stage toward the twelfth step by 0.1 mm, reduce the voltage of EREF (adjusted in step 8) by 10 mV. If the stopper bend has been dislocated in the direction of the twelfth CD, turn VR802 to the right(Fig. 4). To raise the stage toward the first step by 0.1 mm, increase the voltage of EREF (adjusted in step 8) by 10 mV. 13. Place the mechanism horizontal. Go back to step 11 to reconfirm the stage height. 14. When adjustment of the stage height is completed, proceed as follows: 15. Press the EJECT switch. 16. Once operation of the mechanism has stopped, turn the power OFF.
VR802
EREF GND
47k�
L.P.F.
1µF
Oscilloscope
17. Wait more than one minute after the power is turned off, then turn the power ON and insert a magazine. 18. Check if the mechanism operates correctly with the first, sixth, seventh and twelfth CDs. 19. If the mechanism operates properly, adjustment is completed. If the mechanism operates improperly, make the adjustment again.
45
|
|
 |
> |
|