|
Who's Online
There currently are 5806 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
hat alles sehr gut geklappt. Das Servicemaual ist gut zu verwenden. Die Pläne und Schrift
ist klar und leserlich. Außerdem preiswert. Grüße an alle Hifi-Bastler
;
I got the manual quickly after the payment was transfered (1 day). The manual was exactly what i needed and the updates via e-mail were great. Thanx!
;
I've looked for this manual all over that internet, you guys had it and to a good price. A++++
;
I've looked some time for this manual, you guys had it and to a good price. A++++
;
factory technician level - complete with board views :
( removing chassis from cabinet , only thing missing ) ;
on weekends , staff is not available so - be patient .
CDX-M2096ZRN
12. To see the amount of dislocation, place the mechanism upside-down. If the stopper bend has been dislocated in the direction of the first CD, turn VR802 to the left(Fig. 2).
EREF
VR802
GND
To lower the stage toward the sixth step by 0.1 mm, reduce the voltage of EREF (adjusted in step 8) by 20 mV. If the stopper bend has been dislocated in the direction of the sixth CD, turn VR802 to the right(Fig. 4). To raise the stage toward the first step by 0.1 mm, increase the voltage of EREF (adjusted in step 8) by 20 mV. 13. Place the mechanism horizontal. Go back to step 11 to reconfirm the stage height. 14. When adjustment of the stage height is completed, proceed as follows: 15. Press the EJECT switch. 16. Once operation of the mechanism has stopped, turn the power OFF. 17. Wait more than one minute after the power is turned off, then turn the power ON and insert a magazine. 18. Check if the mechanism operates correctly with the first and fourth CDs. 19. If the mechanism operates properly, adjustment is completed. If the mechanism operates improperly, make the adjustment again.
mV meter
38
|
|
|
> |
|