|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
Fast delivery and good quality manual.
Very easily downloadable from a given url.
Will be pleased to buy again from this seller.
 ;
Ottimo manuale, grafica ferfetta invio rapidissimo. Altissimo livello!!!!!
 ;
Great PDF easy to read good info needed for replacment of belts and assembly and specs.
 ;
complete and unabridged very good quality
easy to download.
recieved in two days.
 ;
Awesome manual. Complete diagrams of all board assemblies as well as how to get to each part of the t.v. down to the individual screws and their locations. Get it.
CDX-M2096ZRN
12. To see the amount of dislocation, place the mechanism upside-down. If the stopper bend has been dislocated in the direction of the first CD, turn VR802 to the left(Fig. 2).
EREF
VR802
GND
To lower the stage toward the sixth step by 0.1 mm, reduce the voltage of EREF (adjusted in step 8) by 20 mV. If the stopper bend has been dislocated in the direction of the sixth CD, turn VR802 to the right(Fig. 4). To raise the stage toward the first step by 0.1 mm, increase the voltage of EREF (adjusted in step 8) by 20 mV. 13. Place the mechanism horizontal. Go back to step 11 to reconfirm the stage height. 14. When adjustment of the stage height is completed, proceed as follows: 15. Press the EJECT switch. 16. Once operation of the mechanism has stopped, turn the power OFF. 17. Wait more than one minute after the power is turned off, then turn the power ON and insert a magazine. 18. Check if the mechanism operates correctly with the first and fourth CDs. 19. If the mechanism operates properly, adjustment is completed. If the mechanism operates improperly, make the adjustment again.
mV meter
38
|
|
 |
> |
|