|
There are currently no product reviews.
 ;
Good service manual. I gat all I want. Copy is good, but could be better. All clear and useful. I sincerely recommend.
 ;
The schematic is very helpful and the images are very good.The schematic is very helpful and the images are very good.The schematic is very helpful and the images are very good.The schematic is very helpful and the images are very good.The schematic is very helpful and the images are very good.The schematic is very helpful and the images are very good.
 ;
Welcome. The scheme is clearly helped me to repair. Worth to download it.
 ;
Excellent manual, very clear, technical specification provided, useful information regarding adjustment and set up.
 ;
fast and easy and exactly what I was looking for. Not the cheapest but value for money after all.
CDX-M620/M670 SECTION 3 PHASE ALIGNMENT
3-1. ARM (A-L) ASSY, ARM (B-L) ASSY
3 arm (A-L) assy
4 stop ring 1.5, type-E
2 stop ring 1.5, type-E 1 arm (B-L) assy
bracket (L) assy
3-2. CAM (L)
1 Move the arm (B-L) assy in the direction of the arrow A and the arm (A-L) assy in the direction of the arrow B fully (full open state). 2 Align the hole (large) on the cam (L) with part C and install the cam. 4 Turn the cam (L) clockwise and counterclockwise to verify that both the arms are operated. 3 stop ring 1.5, type-E
hole(large)
cam (L)
C
line
A
arm (B-L) assy arm (A-L) assy
B
22
|