|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
Alte gescannte Servicepläne sind oft doch etwas undeutlich . Stromlaufpläne werden auf mehrere DIN A4 Seiten aufgeteilt. Alles ziemlich umständlich und zeitaufwendig. Aber mit etwas Mühe geht alles.
 ;
Great item, high resolution, detailed, very easy to work with.
 ;
fast delevery of the manual and very complete manual, now my Akai works again, will buy again, thanks.
 ;
Tartalma megfelelő. Szebb kivitelű is lehetne a scannelés.
 ;
I never been disappointed in my dealings with owners-manuals.com
a2
First, fix one end of the earthing wire to the iron part of the power board. See the location indicated on the diagram (a1). Then, fix the other end of the earthing wire in the location indicated on diagram (a2).
a1
Affix the power board, and secure a washer and screw in the location indicated on the diagram.
30
Pass the wire through the slot in the lamp board as indicated in the diagram.
CP-RX60(C12XM)
Place the slot of the lamp board onto the power board, and secure it in the location indicated on the diagram using two screws.
32
Use of M4 screw. Use of crow washer. Attach the fan, and secure two screws in the locations indicated on the diagram.
After arranging the wire as shown in the diagram, fasten it in the location indicated in the diagram. Secure it in place using one screw.
Fasten the wire in the location indicated on the diagram, and secure it with two screws. Attach a magnet.
Attach the black mylar to the location indicated in the diagram.
Wiring diagram 2 (C12XM)
|
|
 |
> |
|