|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
El producto satisface las necesidades del servicio t
 ;
This is a good quality scan of the Operation & Maintenance (Service) Manual for the PAL version of this high-band broadcast umatic, BVU-800P
All schematics and lineup procedures appear to be included in this one manual AFAICT.
The file size is just over 113 MB which gives an idea of the quality and number of pages.
All of the schematics, which contain some fairly small print, are easily readable when you zoom into the page.
John Thompson, Newcastle Upon Tyne, England.
 ;
Good quality, all schematics of few of models. There is also short form of user manual and regulation manual.
 ;
Perfect copy of the service manual. you can enlarge every page, and it comes up
with all details.
 ;
It´s very very nice manual with all, what i need. Original in good quality. Very fast business. Very much thanks...
7. Wiring diagram
Wiring for Circuit Power Supply and Ballast Power Supply Boards
Wiring for Circuit Power Supply Board (1) Keep a record of the circuit power supply lot number in the 100% inspection record. (2) Connect the TSW. (3) Install the FEB3. (4) Connect the CNPOW. (5) Connect the CNTH. (6) Apply the TAP3. Wiring for Ballast Power Supply Board (1) Keep a record of the ballast power supply lot number in the 100% inspection record. (2) Cut off the PVC sheet. (3) Connect the CNPWR. (4) Install the FEB2. (5) Connect the CNBAR. (6) Install the ballast shield (in accordance with the general assembly drawing). Connect the FEB2 (ferrite core) to the CNPWR then move the CNPWR to the connector as illustrated below:
CP-S318(C3SM4) / CP-X328(C3XM4)
CN101
1pin
CN104
2-8pin J2
FEB3 9-14pin
CNPOW
J1
CN102
TSW Pass the leads through the board holder notch.
Connect the CNPWR to connector J1 then make sure that the CNPWR is completely locked.
FEB2
CNPWR
30
Sensor board Connect the CNTH to connector E950 on the sensor board. E950 Sensor board CNTH
CNBAR
Connect the FEB3 (ferrite core) to pins 2-8 of the CNPOW.
Connect the CNBAR to connector J2, while holding down the small board mounted with the J2 (to prevent stress on the small board).
Make sure that the CN102 and the CN104 have been securely connected (since they cannot be checked in subsequent processes).
Cut off the PVC sheet by bending it back and forth 2 or 3 times with your hand, while holding down the double-coated adhesive tape affixed to the igniter transformer so the tape cannot come off. Igniter transformer
Install the sensor board after completing the following steps: Make sure that connector E950 has been securely connected then apply the TAP3 (to prevent detachment).
Perforation
Cut off the sheet by bending it back and forth 2 or 3 times.
TAP3
C3SM4 / C3XM4 Chassis Wiring diagram 1
|
|
 |
> |
|