|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
Great tape deck manual!
I'm very positively surprised, because it is a very long manual, lot of pages, drawings, diagrams, description of how to make the alignment and adjustment procedures.
It is as good as the old "Naka" manuals from the 1970's - if somebody have seen them, they know what I mean by that.
I recommend to buy this very much !
 ;
I am a vintage hifi collector. No way to fix that device without the appropriate service manual...thanks to your site I got it and every thing is easier now. I got the manual right after ordering: fast cheap accurate ... thank you
 ;
Wonderful job clear. Qick fantastic. These people are really good. If even a problem arise they are wonderful assisting you. These scheme is so net despite this is a very old TV. Thank you for everything!!!!!!!!
 ;
Detailed schematic diagram, manual for professionals
 ;
Good service manual,exploded view,adjusment and test point locations,head alignment,mechanical checks and adjusments,all perfect.
(3) Power supply board block wiring (for board block sub-assembly construction) (a) Wiring after lapping the ballast holder over the power supply board
(c) Wiring for lapping the ballast board over the power supply board
CNBAR
Ballast board
Lay the CNBAR lead illustrated so no lead slack can be left. (Pass the CNBAR lead through the notch Ballast board.) #3054
Power supply air intake fan
Lay the #3054 (Power supply air in take fan) lead at the width side of the fan.
CNPWR CNPW2 TSW2 CNPW1
Power supply board
Pass these 3 cables through the notch on the power supply board holder and tense them (since slack cables may contact the primary side of the power supply).
TSW
When lapping the ballast board over the power supply board, pull the CNBAR cable to the left (in the arrowed direction in the drawing below) (since the power supply air intake fan rotary blades contact the cable if the cable is at the right side).
CP-X870
32
(b) Wiring before lapping the ballast board over the power supply board
(d) Wiring after lapping the ballast board over the power supply board
CNPWR
Ballast board
Power supply board
Connect the CNTH cable to sensor board connector E950.
CNBAR
CNTH
#3054 lead
J1
Connect the CNPWR to connector J1 and check that the CNPWR is completely locked.
Lay the lamp leads near the power supply block without slacking the leads (to keep them away from the exhaust fan rotary blades).
Lamp lead
Lay the lamp leads along the power supply block groove.
Wiring diagram (C8XD)
|
|
 |
> |
|