|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
fast delevery of the manual and very complete manual, now my Akai works again, will buy again, thanks.
 ;
Tartalma megfelelő. Szebb kivitelű is lehetne a scannelés.
 ;
I never been disappointed in my dealings with owners-manuals.com
 ;
Excellent printing quality. A complete and very useful manual with all details.
 ;
Even if the PDF is a scan, I can read the information I need.
The price is affordable and the service (mail sending) is very fast.
Thanks ! Regards. William (Fan of Kenwood)
CR14
� Assembly of Change arm
Step 24: Insert service jig into the traverse hole, rotate the gear clockwise. Step 22: Slot the traverse unit assy onto the UD base as arrow shown. Note: Ensure the bosses fix exactly onto the guides. Note: Ensure the groove of the TRV slide plate assy stop at the position shown.
Step 23: Push the guide to lock the traverse unit assy in.
Step 25: Install the change arm to the groove of the TRV slide plate assy. Step 26: Push the TRV slide plate assy as arrow shown to lock the change arm.
45
|
|
 |
> |
|