|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
Excellent product, very clear print. Detailed circuit and assembly diagrams - this enabled me to repair my CD player with confidence. I highly recommend this site.
 ;
Fast access, 100% correct and complete service manual
 ;
just what i was seeking .had a password issue but the review allowed me to circumvent and download was great
 ;
Great manual, great price. Has a few of the basic operating instructions that most service manuals leave out. Complete instructions for disassembling board by board, safety precautions, schematics, complete parts list.
 ;
I am very pleased with the service manual for my RT-909. This was an easy purchase and great procuct, and much cheaper than other venues i had looked at. This web site is now listed in my favorites list. KEEP UP THE GOOD WORK. THANKS. J. BROWN
CX-954
2. The right and left load levers move toward the front part of the mechanical module, to release the locking of the load cam, at the front and rear ends of the levers, with the four shafts of the CRG chassis unit and the shaft of the clamp arm. The right front section of the load cam turns the clamp switch ON, completing the clamp operation.
A shaft (CRG) locked with the cam A shaft (clamp arm) locked with the cam A shaft (CRG) locked with the cam Shafts (CRG) locked with the cam
2.4 Disk eject operation
1. When the loading motor turns in reverse, the disk eject operation begins. 2. The ejection of a 12 cm disk is completed when the SW3 turns OFF, then ON, and then OFF again. 3. The ejection of an 8 cm disk is completed when the SW2 turns OFF, then ON, and then OFF again.
18
|
|
 |
> |
|