|
There are currently no product reviews.
 ;
Great product, very good quality, found all needed information. Thanks
 ;
Excellent quality, helped to fix problem. Thank you very much!!!!
 ;
I thank Owner-Manuals.com for providing the necessary manual very quickly, and it was very helpful in repairing my personal Audio System and I once again thank them for the wonderful customer's service satisfaction.
Thanks.
 ;
Everything fine: quick service, no glitch and above all a very good quality of the Pdf file. Thank you!
 ;
The manual was complete, parts list, adjustment procedures, etc. No worries
1
2
3
4
A
1.3 Requirements for storage and baking after opening the antihumidity packaging (dry bag)
After a dry pack has been opened, all SMD packages within that bag must complete all solder reflow processing, including rework, within 168 hours (1 week), unless opened parts are stored in a dry cabinet at <10% RH. After this time, parts must be baked as per the below conditions before use. Heatproof trays (you will see clear �Heat Proof Tray� markings) are employed for some products. If the term of viability after opening the antihumidity packaging elapses during your manufacturing span, be sure to apply a baking process to the products with the heatproof tray before mounting the products. The recommended baking conditions are as follows: at 125 degrees C for 24 hours
B
1.4 Analysis of nonconforming items
When you remove our semiconductor products to analyze a nonconforming item, it is recommended to remove them after baking under the conditions mentioned in 1.3 above. If you remove the product using hot air in a status where the resin has absorbed moisture, heat stress may cause package cracking or adhesion degradation of the resin, and the actual reason for nonconformity may not found easily.
C
D
E
F
60
1 2
DBR-TF100
3 4
|