|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
Very complete and well reading drawings. Documentation is essential for successful repairs.Good documentation, with all that is necessary. This manual was what I was waiting with all the information necessary for the repairing I need it for. You must buy it if you want to do repairs or simply understand how it works.
 ;
Excellent service manual includes everything is need to repair this radio-caseete, how to disassemble, wiring diagram, all , waiting time until the download was only a few hours. I'm going to buy service manuals from here, are cheap and very good.Thank you.
 ;
Good service manual,i saved from scrapping this deck,is now fully functional.Thanks.
 ;
Found this to be the manual included with the original packinging, was helpfull but did not give any detailed repair instructions.
 ;
Complete service manual, was very helpful in repairing this tapedeck.Thanks.
DV MECHANICAL ADJUSTMENT MANUAL VII
3-25. Coaster (S) Block Assy and Coaster (T) Block Assy
1.
1)
Removal procedure
Remove the coaster (T) block assy 1 from the coaster (T) block shaft. Remove the coaster (T) block assy from the right groove of the drum base. Remove the coaster (S) block assy 2 from the coaster (S) block shaft. Remove the coaster (S) block assy from the left groove of the drum base. Remove coaster (S) assy 3 by rotating it through the key hole of GL (S) assy 4.
2.
1) 2)
Attachment procedure
Install the coaster (S) assy 3 into the key hole of the GL (S) assy 4 by rotating it. Insert the coaster (S) block assy 2 into the coaster (S) block shaft. While aligning it with the left groove of the drum base, push it in the way that the V-groove comes to the top until it reaches the pressure-bearing S. Push in the coaster (T) block assy 1 along with the right groove of the drum base. Align the phase of the GL gear S, GL gear T and the GL drive arm at the three phasing locations. Then install the coaster (T) block assy 1 in the coaster (T) block assy shaft.
2)
3)
3)
Key Points in Re-assembling
� When aligning the coaster (S) assy with the left groove of the drum base, the V-groove must come to the top. � TG4 and TG5 must not have any stain and their arms must not be deformed.
2 Coaster (S) block assy 4 Keyhole of GL (S) assy
Phase Adjustment Key Points in Re-assembling
When re-assembling, adjust the gear phase at the three positions. GL gear (S) GL gear (T)
V-groove must come to the top.
3 Coaster (S) assy
1 Coaster (T) block assy
Coaster (S) shaft
Pressurebearing S V groove The second tooth from the left
GL driving arm Drum base groove GL gear (T) � mark
GL gear (S) GL gear (T) shaft GL driving arm
The second tooth from the left GL driving arm
� The second tooth from the left of the GL gear (S) and the V-groove of the GL gear (T) must be in phase. � The second tooth from the left of the GL drive arm and the v mark must be in phase.
� 36 �
 $4.99 DCRHC40 SONY Owner's Manual Complete owner's manual in digital format. The manual will be available for download as PDF file aft…
|
|
 |
> |
|