|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
Very easy site. Great service and quick release for download. Manuals are of good quality.
Joop - The Netherlands
 ;
Very good manual, in depth and complete. Only criticism is that some of the circuit diagrams are slightly blurry and hard to follow for long periods of time, but this is to be expected. Perfect for any maintenance required. Also contains the wiring diagrams of the control cable for constructing extensions.
 ;
Received a quick response, material was exactly what it was supposed to be. The service did everything I expected it to do. would use service again.
 ;
Detailed SONY CFD980 Service Manual at an easy to find one stop shopping. Make my radio hobby technically interesting. Thanks.
 ;
Excellent service from Owner-Manuals.com, good prices and quick turn around. The supplied PDF was good enough quality to be enlarged sufficiently to read component values.
4-3. Drum Base Assembly, Drum Earth
1. Removal procedure
1) Remove the capstan flexible board and flexible wiring board (FP-300) from the holders X, Y and Z in the direction of the arrow. Remove the drum assembly. (Refer to section 4-1.) Remove the screw (M1.4 � 2.5) 2. Remove the claw D of the guide rail T2 3 from the hole E of the drum base assembly in the direction of the arrow F. Remove the three screws (M1.4 � 2.5) 4. Remove the drum base assembly 5 in the direction of the arrow. Remove the screw (screw assy PW M1.7 � 2.6) 6. Remove the drum earth 7 and earth spacer 8.
2. Attachment procedure
1) Attach the ground spacer 8 and drum ground 7 with the screw (screw assy PW M1.7 � 2.6) 6. Tightening torque: 0.078 ± 0.01 N�m (0.8 ± 0.1 kgf�cm) Align the drum base assembly 5 with the reference pin and tighten the three screws (M1.4 � 2.5) 4 in the order of G, H and I. Insert the claw D of the guide rail T23 into the hole E of the drum base assembly 5 and tighten the screw (M1.4 � 2.5) 2. Tightening torque: 0.078 ± 0.01 N�m (0.8 kgf�cm) Remove the drum assembly. (Refer to 4-1.) Attach the flexible wiring board (FP-300) 1 and capstan flexible board to the drum base assembly. Clean the tape running path. (Refer to 2-2.)
2) 3) 4) 5) 6) 7) 8)
2)
3)
4) 5) 6)
G F
hole E
H I 4 Three screws (M1.4 � 2.5) 5 Drum base assembly
2 Screw (M1.4 � 2.5)
Guide rail (T2) Remove the guide rail (T2) in the direction of the arrow F.
Claw D
Drum base assembly
3 Guide rail (T2)
Remove the flexible board in the direction of the arrow A B C. FP-300 flexible board
C B 6 Screw (screw assy PW M1.7 � 2.6) 7 Drum ground Z Y X A 8 Ground spacer
Two dowels
Claw D
Capstan flexible board
1 FP-300 flexible board, Capstan flexible board
Fig. 4-3.
� 16 �
|
|
 |
> |
|