|
There are currently no product reviews.
 ;
Good quality, clear diagrams. Exactly what I needed.
 ;
Good product. All the information is invcluded, but due to the complexity of the amplifier, it still is difficult to get it to operation again.
 ;
Very professional seller; very fast, accurate and rielable service.
 ;
great works fine, got the manual on mail within a day
 ;
First class Service,
best quality, come again
Thank You.
vac
DCR-TRV940/TRV940E/TRV950/TRV950E
1-3. POWER SUPPLY DURING REPAIRS
In this unit, about 10 seconds after power is supplied to the battery terminal using the regulated power supply (8.4V), the power is shut off so that the unit cannot operate. These following two methods are available to prevent this. Take note of which to use during repairs. Method 1. Use the AC power adaptor (AC-L10, AC-VQ800 etc.). Method 2. Connect the servicing remote commander RM-95 (J-6082-053-B) to the LANC jack, and set the commander switch to the �ADJ� side.
1-4. TO TAKE OUT A CASSETTE WHEN NOT EJECT (FORCE EJECT)
1 2 3 4 5 6 7 Refer to 2-2 to remove the cabinet (R) block assembly. Refer to 2-7 to remove the F panel block. Refer to 2-11 to remove the battery panel block. Refer to 2-13 to remove the ST frame block. Refer to 2-14 to remove the DB-014 board. Refer to 2-15 to remove the MD block. Supply +4.5V from the DC power supply to the loading motor and unload with a pressing the cassette compartment.
DC power supply (+4.5Vdc)
: Unloading : Loading
Disconnect from CN1006 (27P) of VC-288 board
Loading motor
1-2
|