|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
The manual was as described. Complete with parts list and technical information. Fast delivery.
 ;
Simple and fast...
The diagrams are clear and legible; i have been a great help.
The site is very reliable and precise thanks.
 ;
Very easy site. Great service and quick release for download. Manuals are of good quality.
Joop - The Netherlands
 ;
Very good manual, in depth and complete. Only criticism is that some of the circuit diagrams are slightly blurry and hard to follow for long periods of time, but this is to be expected. Perfect for any maintenance required. Also contains the wiring diagrams of the control cable for constructing extensions.
 ;
Received a quick response, material was exactly what it was supposed to be. The service did everything I expected it to do. would use service again.
DCR-TRV940/TRV940E/TRV950/TRV950E
1-3. POWER SUPPLY DURING REPAIRS
In this unit, about 10 seconds after power is supplied to the battery terminal using the regulated power supply (8.4V), the power is shut off so that the unit cannot operate. These following two methods are available to prevent this. Take note of which to use during repairs. Method 1. Use the AC power adaptor (AC-L10, AC-VQ800 etc.). Method 2. Connect the servicing remote commander RM-95 (J-6082-053-B) to the LANC jack, and set the commander switch to the �ADJ� side.
1-4. TO TAKE OUT A CASSETTE WHEN NOT EJECT (FORCE EJECT)
1 2 3 4 5 6 7 Refer to 2-2 to remove the cabinet (R) block assembly. Refer to 2-7 to remove the F panel block. Refer to 2-11 to remove the battery panel block. Refer to 2-13 to remove the ST frame block. Refer to 2-14 to remove the DB-014 board. Refer to 2-15 to remove the MD block. Supply +4.5V from the DC power supply to the loading motor and unload with a pressing the cassette compartment.
DC power supply (+4.5Vdc)
: Unloading : Loading
Disconnect from CN1006 (27P) of VC-288 board
Loading motor
1-2
|
|
 |
> |
|