|
There are currently no product reviews.
 ;
Excellent manual. Helped me out with disassembling and troubleshooting my projector.
 ;
thanks you are the best.Very good detail, Quick service response. A useful service manual with all details.
 ;
Great service!!! Polecam gorąco wszystkim zainteresowanym
 ;
I liked the price plus it had everything i needed to service the tv.
thankyou Tim Hertz
 ;
The manual is excellent, well detailed, and divided into two parts. Received very quickly. Thank you.
1
2
3
4
- How to remove the Load Carriage Motor Assy
1. Make the system in the carriage mechanism mode, and have it clamped. 2. Release the leads (orange and purple) of Load Carriage Motor Assy from the CD Core Unit and remove the holder. 3. Remove the Poly Washer, Change Arm, and Pickup Lock Arm. 4. Remove the two Screws (A) and the Bevel Gear Bracket (Note that the gears will come off). 5. Remove the two Screws (B) and the Gear Bracket (remove the CD Core Unit, if necessary), and remove all the gears. 6. Remove the two Screws (C) and the Load Carriage Motor Assy. Caution: When assembling the Load Carriage Motor Assy, move it to the direction shown in the illustration (1). When treating the leads of the Load Carriage Motor Assy, do not make them loose over the Feed Screw.
Gear Bracket Screw B Screw A Bevel Gear Bracket Poly Washer Change Arm Pickup Lock Arm
A
B
Load Carriage Motor Assy
Screw C
C
1
D
E
F
26
CX-3164
1 2 3 4
|