|
There are currently no product reviews.
 ;
y'm hapy for this shoping . Estoy feliz por esta compra , ahora puedo reparar mi equipo de audio que AMO . And very good price for this manual . Thank yuo .
 ;
Perfect manual, perfect service. Easy reading. Thanks a lot
 ;
Very good quality download here. Great hard to find manuals at a reasonable price.
 ;
I had a problem with the mains transformer, I did not know the voltages on the secondary, this manual helped me to solve this problem, thanks for the manual!
 ;
Great manual, great quality copy, complete parts reference and scematics, Thank you
5
6
7
8
- Clamp actions mechanism
1. With an 8 or 12cm-disc centered on the spindle, the Detection Arm is moved. 2. The movement of the Detection Arm engages the Loading Rack with the 2-Stage Gear. 3. The Clamp Lever slides and lowers the Clamp Arm (the disc is clamped). At the same time, the Roller Up Arm is rotated, and the Rubber Roller is separated from the disc. Also the arm slides the Mechanical Lock Lever, turns the Mechanical Lock Arm, and releases the mechanical lock, completing the clamp operation. 4. When the clamp action is completed, the Clamp Lever rotates the Gear Lock Arm. When the arm is rotated, the Planet Gear is separated from the 2-Stage Gear and engaged with the gear of the pickup feed screw, and the carriage operation will start
Detection Arm
1 1
A
Clamp Arm
Feed Screw's Gear
Clamp Lever 3
Loading Rack
B
2
2-Stage Gear
8 7
Gear Lock Arm
4 5
Planet Gear Roller Up Arm
C
Rubber Roller
Mech Lock Arm
6
Mech Lock Lever
- Eject actions
1. When the Load Carriage Motor is rotated backward, and the pickup is fed to the inner periphery passing the home SW ON point, the eject action will start in the reverse order of the procedure mentioned earlier. 2. For a 12cm-disc, Eject is completed when SW3 is switched OFF, ON, and OFF again. 3. For an 8cm-disc, Eject is completed when SW2 is switched OFF, ON, and OFF again.
D
E
F
CX-3164
5 6
7
8
21
|