|
Who's Online
There currently are 5981 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
I was at first dubious about payiong for downloaded manuals but having done so, I was extremely impressed with quality of the two manual I ordered, well worth the small price I paid.
I would highly recommend these to my friends.
;
reasonable price for the schematic - the service is perfect, all as expected and pointed by instructions - good scan of the original plans - thank you!
;
Manual was just as described!!! I odered it and in less than a day was able to download it and the text was clear and pages were all complete just as the original manual was. Purcashed this for a friend and they were more than happy. Perfect all around!
;
Excellent service and prompt delivery. But it's not a manual - only 4 pages wiring diagrams.
Thanks.
;
The manual I purchased was exactly what I needed to repair my Toshica television. The manual contained schematics and troubleshooting information that was very helpful.
5
6
7
8
- How to remove the Clamp Arm Assy
1. Make the system in the carriage mechanism mode, and set the mechanism to the eject mode. 2. Remove the three Springs. 3. While pressing the position A, turn the Clamp Arm Assy upward, slide it to the left, and remove. Caution: When assembling, place the boss of the Detection Pin in the cam unit of the Loading Rack.
A
Spring
B
Clamp Arm Assy Spring Detection Pin Spring A
place the boss in the cam
Detection Pin
C
- How to remove the Spindle Motor Assy
1. Make the system in the carriage mechanism mode, and have it clamped. 2. Remove the CD Core Unit and remove the leads from the Inner Holder. 3. Set the mechanism to the eject mode and remove the Clamp Arm Assy. 4. Set the mechanism to the clamped and move the Pickup to circumference. 5. Remove the two Screws, and remove the Spindle Motor Assy.
Screw
D
Spindle Motor Assy
E
F
CX-3164
5 6
7
8
27
|
|
|
> |
|