|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
The manual was as described. Complete with parts list and technical information. Fast delivery.
 ;
Simple and fast...
The diagrams are clear and legible; i have been a great help.
The site is very reliable and precise thanks.
 ;
Very easy site. Great service and quick release for download. Manuals are of good quality.
Joop - The Netherlands
 ;
Very good manual, in depth and complete. Only criticism is that some of the circuit diagrams are slightly blurry and hard to follow for long periods of time, but this is to be expected. Perfect for any maintenance required. Also contains the wiring diagrams of the control cable for constructing extensions.
 ;
Received a quick response, material was exactly what it was supposed to be. The service did everything I expected it to do. would use service again.
6-1-6. AT Head Height Check and Adjustment
Check 4. Turn the Power On
. Alignment tape : SR2-1/SR2-1P (00:00 to 15:00)
5. Play Back the Alignment Tape Play back the SR2-1/P (0:00 to 15:00). 6. Check the AT Head Height (1) Check that the level of CH-2 remains unchanged when portion A of the tape is lightly pushed downward. If the level is changed, perform steps 7 and 8. (2) Check that the level of CH-2 decrease when portion B of the tape is lightly pushed up. If the level increase, perform steps 7 and 8.
<PB LTC output waveform> B AT head TG-3 (Exit guide) A
CH-2 (PB LTC)
Spec.1 : Level remains unchanged by pushing the tape downward. Level decreases by pushing the tape upward.
AT Head Height Check
DNW-75/75P
6-31
|
|
 |
> |
|