|
There are currently no product reviews.
 ;
Good quality, all schematics of few of models. There is also short form of user manual and regulation manual.
 ;
Perfect copy of the service manual. you can enlarge every page, and it comes up
with all details.
 ;
It´s very very nice manual with all, what i need. Original in good quality. Very fast business. Very much thanks...
 ;
Purchased the manual that I was looking for at a great price and could download it easily.. Great service experience and for future purchases I plan to use the site.
Thank you very much
 ;
Exactly what was needed to assess the product - excellent value and great service
5
6
7
8
7.1.10 DISASSEMBLY
Note: For performing the diagnosis shown below, the following jig cables for service are required: � GGD1330 �2
A
Diagnosis of the PCBs
Procedures ; JCKB Assy : ¥ � ø � � DVDM Assy : ¥ � ø � [
1 Bonnet and Tray Panel
1 2 3 4 5 6
Remove the Bonnet by removing the five screws. Press the STANDBY/ON button to turn on the power. Press the 0 button to open the tray. Remove the tray panel. Press the 0 button to close the tray. Press the power. STANDBY/ON button to turn off the
26
B
4 3 5
Tray Panel Tray
35
C
How to open the Tray when the power cannot be on
Insert a screwdriver (small) into the slit located at the bottom of the unit, and slide the projection of the drive gear in the loading mecha. assy in the direction of the arrow, as indicated in the photo. If the tray pops out a little, fully pull it out by a hand.
D
Screwdriver (small) Projection
Slit Drive Gear Loading Mecha.Assy
E
Tray open
Screwdriver (small)
F
DV-667A-K
5 6 7 8
67
|