|
There are currently no product reviews.
 ;
Quick response.
Good quality.
Not large price of documents.
Thanks.
Dzięki.
 ;
All ok:
Good quality.
Quick response.
Not large price of documents.
Thanks
 ;
The manual was complete and extremely helpful in both diagnosing the problem I was having as well as fixing it. Excellent quality. I will getting additional manuals in the future.
 ;
Exactly the JVC service manual and schematics that I was looking for - delivered just hours after order. Will do business again!
 ;
This is a fantastic site, ad I have been a returning satisfied cusumer!
Thanx for a great sevice!
CX-954
2. The right and left load levers move toward the front part of the mechanical module, to release the locking of the load cam, at the front and rear ends of the levers, with the four shafts of the CRG chassis unit and the shaft of the clamp arm. The right front section of the load cam turns the clamp switch ON, completing the clamp operation.
A shaft (CRG) locked with the cam A shaft (clamp arm) locked with the cam A shaft (CRG) locked with the cam Shafts (CRG) locked with the cam
2.4 Disk eject operation
1. When the loading motor turns in reverse, the disk eject operation begins. 2. The ejection of a 12 cm disk is completed when the SW3 turns OFF, then ON, and then OFF again. 3. The ejection of an 8 cm disk is completed when the SW2 turns OFF, then ON, and then OFF again.
18
|