|
Who's Online
There currently are 5397 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
El producto satisface las necesidades del servicio t
;
This is a good quality scan of the Operation & Maintenance (Service) Manual for the PAL version of this high-band broadcast umatic, BVU-800P
All schematics and lineup procedures appear to be included in this one manual AFAICT.
The file size is just over 113 MB which gives an idea of the quality and number of pages.
All of the schematics, which contain some fairly small print, are easily readable when you zoom into the page.
John Thompson, Newcastle Upon Tyne, England.
;
Good quality, all schematics of few of models. There is also short form of user manual and regulation manual.
;
Perfect copy of the service manual. you can enlarge every page, and it comes up
with all details.
;
It´s very very nice manual with all, what i need. Original in good quality. Very fast business. Very much thanks...
DV-SP502/502E SERVICE PROCEDURES-2
2. Safety-check out
(Only U.S.A. model) After correcting the original service problem perform the following safety check before releasing the set to the customer Connect the insulating-resistance tester between the plug of power supply cord and terminal GND on the back panel. Specifications: More than 10M ohm at 500V
INITIALIZING
Factory-shipped condition. Connect the power cord to inlet terminal. Push button "ON" (Mechanical SW). Lighting the LED condition. Press the [STOP] and [STANDBY] same time with NO DISC condition. Push button "STANDBY". Pull out the power cord.
REMOVE THE SOLDER OF LASER DIODE SHORT
When replace the mechanism or DVD main PC board. Shorting the solder of Shot-circuit land. (2 positions)
Mechanism
Short Land
|
|
|
> |
|