Super Anleitung. Ordentliche Auflösung. Das ganze noch in Deutsch wäre zu schön. Alle Datenblätter sind sauber Kopiert und alle Leitungswege sind sauber ausgeführt
Thanks God for the internet and thanks for the service like this - proffessional solution on time.
Text excerpt from page 66 (click to view)
DX-SX1H
Checking the lead process
POWER-SW POWER PWB the electrolytic condensers (BI101)
Passing through
Power Transformer 10 pin lead
Check that the lead process is specified as above.
Connect the 2 pin lead from BI101 under the PWB via the nylon band A .
If any one of the bands shown in Fig. 66 is removed for some reason, be sure replace it to the original position and same appearance as before.
Tie the 2 pin lead at back of the PWB. Make the 2 pin lead Tie the 8 pin lead tight as possible. and the 10 pin lead at the two positions.
WIRING OF PRIMARILY SUPPLY LEADS (FOR U.K. ONLY)
Figure 66
Main PWB (CNP308)
� 66 �
Connect 2 pin lead via the 2 Pin lead position as shown in the figure and connected take up slack in the direction as from BI101. shown by the arrow to avoid stress on the PWB.