|
There are currently no product reviews.
 ;
Good quality, clear diagrams. Exactly what I needed.
 ;
Good product. All the information is invcluded, but due to the complexity of the amplifier, it still is difficult to get it to operation again.
 ;
Very professional seller; very fast, accurate and rielable service.
 ;
great works fine, got the manual on mail within a day
 ;
First class Service,
best quality, come again
Thank You.
vac
1. INSTALLATION
Note: Follow the assembly procedure in the numerical order given.
OPTICAL PICK-UP COMPLETE ASS�Y
chuck plate
1 Move the lever (LOCK 3) in direction A, and return it a little in
direction B from the position where the chuck plate is moved down to the lower limit.
B A 3 stop ring 2.0 (E type)
4 tension spring (DH)
2 optical pick-up complete ass�y Note: Insert the shaft (A) first.
shaft (A)
GEAR (LOMINI) / (LOAD 1) ASS�Y
gear (LOAD 2)
2 Attach the gear (LOMINI) at the position shown in Fig. A.
gear (LOMINI) shaft (rotary prevention C) chuck plate
B 1 Move the lever (LOCK 3) fully in direction B to move the chuck plate up.
marking Fig. A
slit
3 Attach the gear (LOAD 1) ass�y with its facing inside. 4 stop ring 1.5 (E type)
�2�
 $4.99 EXCD-3 SONY Owner's Manual Complete owner's manual in digital format. The manual will be available for download as PDF file aft…
|