|
Categories
|
Information
|
Featured Product
|
|
|
 |
|
There are currently no product reviews.
 ;
A deal without problems, very fast and the manual is a good quality. Sorry for the my english.
 ;
Superb service and excellent quality of the document received
 ;
no problems with the purchase of a circuit diagram
 ;
Scan are good quality and overall just what i was looking for. Thanks!
 ;
Very good quality pdf file, no missing pages and all words and schematics clearly readable. Whole manual is present featuring different languages.
4. MECHANICAL ADJUSTMENTS
1. MECHANICAL CHECKS
If irregular operation occurs or when reassembling a part, please check the following. 1) Make sure that the datum hole of the RELAY PLATE meets that of the MAIN BASE in the Eject Mode as shown in Fig. 4-1. 2) Make sure that the datum hole of the CAM GEAR meets that of the MAIN BASE in the Eject Mode as shown in Fig. 4-1. 3) There are two triangle mark in the MODE SWITCH. When installing the L/C BRKT ASS'Y, make sure that the one marks meets the other in the Eject Mode as shown in Fig. 4-2. 4) Make sure the that the BOSS of the PINCH LEVER ASS'Y is located outside of the CAM of the CAM GEAR in the Eject Mode as shown in Fig. 4-2. 5) Make sure that the datum hole of the MAIN PLATE meets that of the MAIN BASE in the Eject Mode as shown in Fig. 43. 6) When installing the RELAY GEAR, make sure that the triangle mark meets the last groove of the teeth of the MAIN PLATE in the Eject Mode as shown in Fig. 4-3. 7) Make Sure that the triangle mark of the L LOADING GEAR ASS'Y meets the -Shaped mark of the R LOADING GEAR ASS'Y in the Eject Mode as shown in Fig. 4-4. 8) Make sure that the 1'st tooth of the R LOADING GEAR ASS'Y meets the 1'st groove of the LOADING GEAR ASS'Y in the Eject Mode as shown in Fig. 4-4.
31
|
|
 |
> |
|
|
Parse Time: 0.31 - Number of Queries: 136 - Query Time: 0.114