|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
OK?..manual is complet and helpfull... for repairing such a old and rare boombox like JVC PCM it is necessary...
 ;
Super Anleitung. Ordentliche Auflösung. Das ganze noch in Deutsch wäre zu schön. Alle Datenblätter sind sauber Kopiert und alle Leitungswege sind sauber ausgeführt
 ;
Thanks God for the internet and thanks for the service like this - proffessional solution on time.
 ;
About the service it's very fast and reliable. About the manual the quality is high enough to read even the tiniest details on the wiring diagrams so you can't ask much more than that, let it alone for a manual of a product from 20 years ago. Thank you, very satisfied.
 ;
The downloaded quality was as good as the orignial
2.6.2 Adjustment of the Tension Arm and Pad Arm Assemblies Use Fig. 2-6-2 as the reference unless otherwise specified. 1. Set the PLAY mode. Se Fig. 2-3-8. 2. Loosen the screw A . 3. With the take-up side at the bottom, align the extreme end of the Tension Arm Assembly with the crossed grooves on the screw B that retains the Loading Motor Assembly and then tighten the screw A . The tightening torque should be 0.069 N�m (0.7 kgf�cm). 4. Check the operation. Repeat unloading and loading several times and make sure that the Tension Arm Assembly is located within the normal range. Note : With the above checking method, a Torque Meter is not used. When a Torque meter is used, the following are the reference values: Back Tension : 2.0 to 6.0 g�cm Play Torque : 8.3 to 12.5 g�cm
SCREW B TENSIOM ARM ASSY
2, 3 SCREW A
Fig. 2-6-2
2.6.3 Adjustment of the Slide Lever 2 Use Fig. 2-6-3 as the reference unless otherwise specified. 1. Set the C IN mode. See Fig. 2-3-4. 2. Loosen the screw A . 3. Set the Main Deck and Slide Deck Assemblies apart so that they do not rattle, then tighten the screw A by screwing it fully toward the Drum Assembly. The tightening torque should be 0.069 N�m (0.7 kgf�cm). 4. Check the operation. Repeat unloading and loading several times and make sure that these operations can be performed smoothly without producing rattles.
3
2, 3 SCREW A
3
Fig. 2-6-3
2-16
|
|
 |
> |
|