|
Who's Online
There currently are 5877 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
Hello.
This paper enable me, to bring this lovley Scope into Function.
Without this Page, i have no cance to make this finish.
Hans M. Knoll Germany
;
I used for first time this the wheat and am very thanked
;
This manual was exactly what i needed and could not find elsewhere. Price is not too high. Great !
;
ecelent I was reciver the service manual soon I fell so happy very complete 100% positive all by this store tanks atte Luis salazar
;
A great copy of the manual, and the only one I could find anywhere on the net! The circuit diagrams are easily readable, all component values marked and easy to see. A highly appreciated download!
2.6.2 Adjustment of the Tension Arm and Pad Arm Assemblies Use Fig. 2-6-2 as the reference unless otherwise specified. 1. Set the PLAY mode. Se Fig. 2-3-8. 2. Loosen the screw A . 3. With the take-up side at the bottom, align the extreme end of the Tension Arm Assembly with the crossed grooves on the screw B that retains the Loading Motor Assembly and then tighten the screw A . The tightening torque should be 0.069 N�m (0.7 kgf�cm). 4. Check the operation. Repeat unloading and loading several times and make sure that the Tension Arm Assembly is located within the normal range. Note : With the above checking method, a Torque Meter is not used. When a Torque meter is used, the following are the reference values: Back Tension : 1.96 to 5.88 mN�m x 0.1 (2 to 6 g�cm) Play Torque : 6.86 to 10.78 mN�m x 0.1 (7 to 11g�cm)
SCREW B TENSIOM ARM ASSY
2, 3 SCREW A
Fig. 2-6-2
2.6.3 Adjustment of the Slide Lever 2 Use Fig. 2-6-3 as the reference unless otherwise specified. 1. Set the C IN mode. See Fig. 2-3-4. 2. Loosen the screw A . 3. Set the Main Deck and Slide Deck Assemblies apart so that they do not rattle, then tighten the screw A by screwing it fully toward the Drum Assembly. The tightening torque should be 0.069 N�m (0.7 kgf�cm). 4. Check the operation. Repeat unloading and loading several times and make sure that these operations can be performed smoothly without producing rattles.
3
2, 3 SCREW A
3
Fig. 2-6-3
2-16
|
|
|
> |
|