|
Categories
|
Information
|
Featured Product
|
|
|
 |
|
There are currently no product reviews.
 ;
Very very good as usual very trustable site. Perfect!!!!!!
 ;
The Service Manual received was helpful. Good copy of original document.. I recomend all of my friends about this technical page.
 ;
Perfect, complete manual, exactly what I needed. Recommended to everyone.
 ;
Very usefull manual. From my point of view there are needs more clearables images.
 ;
Once again owner-manual.com has saved the day for me, and come through with the manual I need. I looked other places too, and couldn't find it anywhere. Thank You owner-manual.com!!! You're the BEST!
2.3
CHECKUP AND ADJUSTMENT OF MECHANISM PHASE
Note: Pay careful attention to the installing order and phase of mechanism parts of the loading system.
Align the two holes of the Loading ring assembly to those of the deck.
Align the hole of the Loading gear (T) assembly to that of the deck.
Align the hole of the link lever assembly to the deck hole.
Align one of the three holes of wheel gear to the deck hole.
Align each one link lever assembly hole and deck hole to the hole at the control cam position.
Fig. 2-3-1 Top of main deck
Align this part to each "Triangle" mark.
Align this part to each "Triangle" mark.
Fig. 2-3-2 Rotary encoder 2-6
|
|
 |
> |
|
|
Parse Time: 0.245 - Number of Queries: 131 - Query Time: 0.063