|
Categories
|
Information
|
Featured Product
|
|
|
 |
|
There are currently no product reviews.
 ;
Superb service and excellent quality of the document received
 ;
no problems with the purchase of a circuit diagram
 ;
Scan are good quality and overall just what i was looking for. Thanks!
 ;
Very good quality pdf file, no missing pages and all words and schematics clearly readable. Whole manual is present featuring different languages.
 ;
Very,very good manual.It was very explicit and readble.It was helpfull.Thanks.
2.3
CHECKUP AND ADJUSTMENT OF MECHANISM PHASE
Note: Pay careful attention to the installing order and phase of mechanism parts of the loading system.
Align the two holes of the Loading ring assembly to those of the deck.
Align the hole of the Loading gear (T) assembly to that of the deck.
Align the hole of the link lever assembly to the deck hole.
Align one of the three holes of wheel gear to the deck hole.
Align each one link lever assembly hole and deck hole to the hole at the control cam position.
Fig. 2-3-1 Top of main deck
Align this part to each "Triangle" mark.
Align this part to each "Triangle" mark.
Fig. 2-3-2 Rotary encoder 2-6
|
|
 |
> |
|
|
Parse Time: 0.267 - Number of Queries: 109 - Query Time: 0.068