|
There are currently no product reviews.
 ;
Very nice to have! Now it is no problem to understand how it is put together.
Helps me a lot.
 ;
good scans, all is clear. all pages in order. recommended
 ;
Très-très bon site, facile, très bon prix.
Au futur besoin, je n’hésiterais à faire appel à vous.
Merci
 ;
This is the correct service manual of SHARP RX-100H(BK) DAT.
 ;
The ervice manual for my 1982 Kenwood KR-1000 receiver is great! Full detail on all circuits with part number detail. I will definately be ordering more manuals for my other vintage equipment! Order was fulfilled quickly! Very efficient ordering process! Thnaks for your help! Great site!
2.3
CHECKUP AND ADJUSTMENT OF MECHANISM PHASE
Note: Pay careful attention to the installing order and phase of mechanism parts of the loading system.
Align the two holes of the Loading ring assembly to those of the deck.
Align the hole of the Loading gear (T) assembly to that of the deck.
Align the hole of the link lever assembly to the deck hole.
Align one of the three holes of wheel gear to the deck hole.
Align each one link lever assembly hole and deck hole to the hole at the control cam position.
Fig. 2-3-1 Top of main deck
Align this part to each "Triangle" mark.
Align this part to each "Triangle" mark.
Fig. 2-3-2 Rotary encoder 2-6
|