Categories
|
Information
|
Featured Product
|
|
|
 |
|
There are currently no product reviews.
 ;
I had a problem with the mains transformer, I did not know the voltages on the secondary, this manual helped me to solve this problem, thanks for the manual!
 ;
Great manual, great quality copy, complete parts reference and scematics, Thank you
 ;
Very good as always. Also this manual appears clear and well processed. I know it will help me to work on this TV. Thank you a lot! Matteo
 ;
complete wiring diagram, without the part list. high quality copy. thanks for promptly.
 ;
Well done scan of a useful manual. It will be useful in my workbench!!
2.3
CHECKUP AND ADJUSTMENT OF MECHANISM PHASE
Note: Pay careful attention to the installing order and phase of mechanism parts of the loading system.
Align the two holes of the Loading ring assembly to those of the deck.
Align the hole of the Loading gear (T) assembly to that of the deck.
Align the hole of the link lever assembly to the deck hole.
Align one of the three holes of wheel gear to the deck hole.
Align each one link lever assembly hole and deck hole to the hole at the control cam position.
Fig. 2-3-1 Top of main deck
Align this part to each "Triangle" mark.
Align this part to each "Triangle" mark.
Fig. 2-3-2 Rotary encoder 2-6
|
|
 |
> |
|
|