|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
This manual is very helpful, correct shematic diagram, and good exploded view.Perfect!
 ;
Alte gescannte Servicepläne sind oft doch etwas undeutlich . Stromlaufpläne werden auf mehrere DIN A4 Seiten aufgeteilt. Alles ziemlich umständlich und zeitaufwendig. Aber mit etwas Mühe geht alles.
 ;
Great item, high resolution, detailed, very easy to work with.
 ;
fast delevery of the manual and very complete manual, now my Akai works again, will buy again, thanks.
 ;
Tartalma megfelelő. Szebb kivitelű is lehetne a scannelés.
HCD-FC7 SECTION 4 ASSEMBLY
� This set can be assembled in the order shown below.
4-1. HOW TO INSTALL THE CAM (EJECT LOCK)
1 Rotate the cam (BU U/D) fully in the direction of arrow. 2 Engage the gear (eject lock) and the gear of the cam (eject lock) aligning the mark with the center of the gear (eject lock).
cam (BU U/D)
mark
gear (eject lock)
cam (eject lock)
� bottom view � front �
4-2. HOW TO INSTALL THE CAM (GEAR)
1 Check that the cam (BU U/D) can not be rotated in the direction of arrow. 2 Align the mark on the cam (gear) with the boss as shown in the figure and install the cam (gear).
cam (gear) cam (BU U/D)
boss
mark
� bottom view � front �
23
|
|
 |
> |
|