|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
A complete manual with all the needed details of calibrations and service instructions about the radio receiver.
A big deal.
Many thanks !
 ;
Fast delivery and good quality copy. To be recommended
 ;
Excellent product, very clear print. Detailed circuit and assembly diagrams - this enabled me to repair my CD player with confidence. I highly recommend this site.
 ;
Fast access, 100% correct and complete service manual
 ;
just what i was seeking .had a password issue but the review allowed me to circumvent and download was great
KX-TG6321S/KX-TG6323PK/KX-TGA630S
10.3. How to Replace the LLP (Leadless Leadframe Package) IC
10.3.1. Preparation
� PbF (: Pb free) Solder � Soldering Iron Tip Temperature of 700 °F ± 20 °F (370 °C ± 10 °C) Note: We recommend a 30 to 40 Watt soldering iron. An expert may be able to use a 60 to 80 Watt iron where someone with less experience could overheat and damage the PCB foil. � Hot Air Desoldering Tool Temperature: 608 °F ± 68 °F (320 °C ± 20 °C)
10.3.2. Caution
� To replace the IC efficiently, choose the right sized nozzle of the hot air desoldering tool that matches the IC package. � Be careful about the temperature of the hot air desoldering tool not to damage the PCB and/or IC.
10.3.3. How to Remove the Shield Case
Note: If you don�t have special tools (ex. Hot air disordering tool), conduct the following operations. 1. Cut the case along perforation.
2. Remove the cut part.
3. Cut the four corners along perforation.
4. Remove the reminds by melting solder.
65
|
|
 |
> |
|