|
Who's Online
There currently are 5759 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
Thank you very much. the Instruction corresponds to my expectations. Sent it in time. I don't regret that paid money.
;
Good quality. Quick service. I recommend to everyone.
;
Very good quality scan of the document. I am very pleased with what I got.
;
PDF Contains
Technical Data, Mechanical data, Detailed Circuit diagram with components value, PCB layout. Actual PCBs Print. Component List, Spare parts code list and Input output detail. It cover LBB1211, LBB1212, LBB1213, LBB1216, LBB1217.
It is the actual Service Manual for SQ10
;
very good manual with clear electrical schemes. Very helpful to find wat was wrong inside my microwave.
Disassembly
4-6-3 Roll Pinch
1. Before you disassemble the roll pinch, you should remove: � OPE Unit (see page 4-9) 2. Remove the four screws securing the OPE unit.
4-6-4 OPE PBA
1. Before you disassemble the OPE PBA, you should remove: � OPE Unit (see page 4-9) 2. Remove the four screws securing the OPE unit.
3. Turn the upper scan frame of the OPE unit over. 4. Remove the three screws and take out the spring pinch. Then take out the roll pinch.
3. Remove the nine screws and take out the PBA and LCD.
Spring pinch
Upper scan frame
Roll pinch
MC-Service
Samsung Electronics
Notes: � Do not turn the OPE unit upside down after you remove the screws securing the PBA. Keys and rubber contacts may be separated and easily lost. � When you reassemble the OPE unit, make sure the keys are in correct position. � When you reassemble the PBA, secure the screws according in the order of the number printed on the PBA. � After reassembling, operate the machine to make sure it works properly. � After reassembling, make sure the LCD is not blocked.
4-11
|
|
|
> |
|