|
Categories
|
Information
|
Featured Product
|
|
|
 |
|
There are currently no product reviews.
 ;
El manual esta muy detallado, los numeros de partes y los esquemas de despiece son correctísimos y muy claros, tanto para los técnicos experimentados como para los novatos.
 ;
Ottima qualità grafica e completo nelle notizie. Costo abbastanza contenuto.
 ;
Great and quick support. The maual was exactly what I was looking for and my problem
solved. Many thanks.
 ;
Very good service Within one day i received a pdf of the users manual and electric circuits so I was able to measure the different voltages in the printed circuit and find out the fault Payment was also reliable and easy.Without the manual i could not have repaired.So thanks to "Search for a manual"
 ;
you are doing great job guys.....my father ask me to find out the schematics of Sony KV25R1D to sort out the problem ..(he was electrical technician, and excperianced with TV and simillar stuff). finally he found the cause and change all necessary parts....now he has got working old dog..and is very happy!!... thank you all.. NB..he also saved the repair cost.
DISASSEMBLY INSTRUCTIONS
2-6: LINK UNIT (Refer to Fig. 2-6) 1. Set the Link Unit to the Eject position. 2. Remove the (A) side of the Link Unit first, then remove the (B) side. 2-9: TENSION ASS'Y (Refer to Fig. 2-9-B) 1. Turn the Middle Gear clockwise so that the Tension Holder hook, is set to the position of Fig. 2-9-A to more the Tension Arm Ass'y. 2. Remove the Tension Spring. 3. Unlock the support 1 and remove the Tension Arm Ass'y. 4. Remove the Tension Adjust. 5. Unlock the 2 supports 2 and remove the Tension Band Ass'y. 6. Float the hook 3 and turn it clockwise then remove the Tension Holder. 7. Remove the SS Brake Spring. 8. Remove the SS Arm Brake.
Tension Arm Ass'y
Link Unit
(B) (A) Link Unit
Main Chassis
Main Chassis
Fig. 2-6
2-7: LOADING MOTOR ASS'Y (Refer to Fig. 2-7) 1. Remove the Link Lever. 2. Remove the screw 1. 3. Remove the Loading Motor Ass'y. 4. Unlock the 2 supports 2 and remove the Deck PCB (BOT). Fig. 2-9-A
Tension Adjust
2 2
Tension Band Ass'y
Loading Motor Ass'y Tension Spring Tension Arm Ass'y
2
SS Brake Spring Main Chassis
1 3
Tension Holder
1
Deck PCB (BOT) Link Lever
SS Arm Brake Inclined S Ass'y
Fig. 2-9-B
� Screw Torque: 5 ± 0.5kgf�cm
Fig. 2-7
NOTE When you install the Tension Adjust, install as shown in Fig. 2-9-C. (Refer to Fig. 2-9-C)
Adjust the direction of the Marker to inside.
2-8: SENSOR COVER L3 (Refer to Fig. 2-8) 1. Unlock the support 1 and remove the Sensor Cover L3.
Main Chassis
Fig. 2-9-C
Sensor Cover L3
1
Fig. 2-8
|
|
 |
> |
|
|
Parse Time: 0.153 - Number of Queries: 124 - Query Time: 0.032