|
There are currently no product reviews.
 ;
I really like this manual and it's reliable.I found and bought easly.thank you.
 ;
Thank you very much. the Instruction corresponds to my expectations. Sent it in time. I don't regret that paid money.
 ;
Good quality. Quick service. I recommend to everyone.
 ;
Very good quality scan of the document. I am very pleased with what I got.
 ;
PDF Contains
Technical Data, Mechanical data, Detailed Circuit diagram with components value, PCB layout. Actual PCBs Print. Component List, Spare parts code list and Input output detail. It cover LBB1211, LBB1212, LBB1213, LBB1216, LBB1217.
It is the actual Service Manual for SQ10
2)
Remove the waste toner bottle unit.
6)
Hold the lock lever, and pull out each color drum unit slowly, and support the lower section of the unit with both hands to remove.
1
2
3)
Loosen the blue screw. Check to confirm that lock is released, and open the drum positioning unit.
a. OPC drum 1) 2) Remove each drum unit from the machine. Remove the screws and remove the DR fixing shaft AS.
2
1
NOTE: When the transfer belt tension of the primary transfer unit is released manually, turn on the power again after completion of the work. (Power OFF-ON) This procedure initializes the transfer roller to return it to the home position. 4) Loosen the fixing screw of the developing unit on the left side of each color drum unit.
3)
Slide the OPC drum to the front side, and lift the drum rear side, and remove the OPC drum from the hole in the front section.
1 2
b. MC charger unit 1) 5) Remove the developing unit with both hands. 2) 3) Remove each drum unit from the machine. Remove the OPC drum. Remove the screws, and remove the MC cover.
1
2
MX-2300/2700 N/G PHOTOCONDUCTOR SECTION i � 4
|