Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
I needed the manual immediately and I got it immediately. I couldn't find this manual anywhere else on the net. The site was easy to traverse, and the price was very reasonable. I'll definitely be back for any future needs.
 ;
I received a good service manual, with good resolution. Improve the instructions for the purchase because they are not well understood.
For the rest, so good.
Thanks Angel.
 ;
Very good documentation for the Grundig 2077 model (as well as similar 800/900/1000 series radios). The first two pages are a summary of reception specifications and output capability. The third page is the tuner dial indicator and dial cord routing diagram. the final ~5 pages are the schematics for the various models (including 2077). The scan quality of the schematics are good, adn can be easily read if zoomed in. The documents are in German, not English as stated. It would have been nice to have the tuning sequence and settings, and some trouble shooting materials... or component and wiring map.
 ;
Perfect like it was descriped, Perfect like it was descriped
 ;
Very good detail, all pages clear, exactly what I needed
30
M32 107E4 GS_3 Go to cover page
Safety test requirements
3. Equipments and Connection
3.1. Equipments For example : - ChenHwa 9032 PROGRAMMABLE AUTO SAFETY TESTER - ChenHwa 510B Digital Grounding Continuity Tester - ChenHwa 901 (AC Hi-pot test), 902 (AC, DC Hi-pot test) Withstanding Tester 3.2. Connection * Turn on the power switch of monitor before Hipot and Ground Continuity testing.
Clip
All units that are returned for service or repair must pass the original manufactures safety tests. Safety testing requires both Hipot and Ground Continuity testing.
HI-POT TEST INSTRUCTION
1. Application requirements
1.1 All mains operated products must pass the Hi-Pot test as described in this instruction. 1.2 This test must be performed again after the covers have been refitted following the repair, inspection or modification of the product.
2. Test method
2.1 Connecting conditions 2.1.1 The test specified must be applied between the parallelblade plug of the mainscord and all accessible metal parts of the product. 2.1.2 Before carrying out the test, reliable conductive connections must be ensured and thereafter be maintained throughout the test period. 2.1.3 The mains switch(es) must be in the "ON" position. 2.2 Test Requirements All products should be HiPot and Ground Continuity tested as follows:
Condition HiPot Test for products where the mains input range is Full range(or 220V AC) HiPot Test for products where the mains input is 110V AC(USA type) Ground Continuity Test requirement
Clip
(ChenHwa 9032 tester)
Video cable
Connect the "video cable"
Test voltage
2820VDC (2000VAC)
1700VDC (1200VAC) 1 second
Test time 3 seconds (min.) Trip current (Tester) set at 100 uA for Max. limitation; set at 0.1 uA for Min. limitation set at 2 seconds
5 mA
Test current: 25A,AC Test time: 3 seconds(min.) Resistance required: <=0.09+R ohm, R is the resistance of the mains cord.
or "grounding screw" to the CLIP on your tester.
Grounding screw
Ramp time
Connect the power cord to the monitor.
2.2.1 The test with AC voltage is only for production purpose, Service center shall use DC voltage. 2.2.2 The minimum test duration for Quality Control Inspector must be 1 minute.No breakdown during the test. 2.2.3 The test voltage must be maintained within the specified voltage + 5%. 2.2.4 The grounding blade or pin of mains plug must be conducted with accessible metal parts.
Power outlet (Rear view of monitor)
4. Recording
Hipot and Ground Continuity testing records have to be kept for a period of 10 years.
|
|
 |
> |
|