|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
This is a great site. I placed my order and by the next am it was available for download. Had some problems with some missing copy on some pages. Once I brought the error to the OMC's attention, the issue was resolved. I'll come back again.
 ;
Mi spiace per non poter scrivere in inglese... ma sono veramente soddisfatto del servizio offerto. Grazie..!!
 ;
The quality of this manual is good. It has all schematics and setup information for both the MDS-B3 and the MDS-B4. The scan quality is quite good, all pages are readable, This service manual also contains scans of the operating instructions from the User manual.
 ;
Quick site processing. A complete and very useful manual with all details. Thank you!
 ;
Das Service Manual war von der ersten bis zur letzten Seite sehr informativ und hilfreich. Die Darstellung aller Teile war klar und der Text gut lesbar.
Vielen Dank, das war nicht der letzte Download bei ownner-manuals.com.
5
6
7
8
6.3 METHOD FOR REPLACING THE SERVICE PANEL ASSY
A
When the Panel Assy is replaced with one for service, the following adjustments are required:
Adjustments of Vofs voltage and Vyprst voltage
Enter the reference adjustment values for the Vofs voltage and Vyprst voltage that are written on the label attached to the panel for service. Note: Enter the values, using an RS-232C command or the Factory Menu.
AWU���� Vofs = 35V Vyprst = 270V Hour Meter Space H (Rear of the Panel) AWU���� Vofs = 35V Vyprst = 270V Hour Meter 1520 H Write in the value for the hour meter when the Panel is replaced (ex. 1520H).
B
Using an RS-232C command Enter a "PFY" command with Factory mode ON. Convert the adjustment voltage values written on the label attached at the rear of the Panel to an input command, referring to the conversion chart. (See the next page.) � Reference adjustment of the Vofs voltage: Ex. "Vofs = 35" � (Check the conversion chart.) Enter "VOF112." � Reference adjustment of the Vyprst voltage: Ex. 50-inch "Vyprst = 270 V" � (Check the conversion chart.) Enter "VRP055." (Note that the conversion charts for 50-inch and 43-inch Panels are different.) Using the Factory Menu
1 1 5 10 15 20 25 30 32 1 1 5 10 15 20 25 30 32
P AN E L
FAC T .
VD 1 � 1 1 6 01 � NT V � J HS 6 [ TBL 1 / 6 0 VS ]
P AN E L
FAC T . ADJ
VD 1 � 1 1 6 01 � NT V � J HS 6 [ TBL 1 / 6 0 VS ]
P AN E L � 1
5
C
5
10
10
15 16
P AN E L � 1
ADJ
(+)
15 16
VOL
RST
P
<=>
: 058
Select the main item "PANEL FACT." by pressing the MUTE key then enter Panel Factory mode by pressing the SET key. Using the 5/� keys, select "PANEL-1 ADJ" then press the SET key to enter the next lower nested layer. Select "VOL-OFFSET" or "VOL RST P" then enter a command value converted from the voltage value, using the 2/3 keys.
D
Clearing data on various histories of the Panel, such as those on the hour meter
� It is necessary to clear the data on the hour meter, etc. to match them to the actual driving hours of the Panel. � It is also necessary to clear the data on SD and PD, because the accumulated power-on time when a shutdown or powerdown occurred is recorded. Note: Clear the values, using an RS-232C command or the Factory Menu. There are two types of hour meters. Do not take the MR hour meter for the hour meter. Using an RS-232C command To acquire the accumulated power-on time of the product itself, use the "GS2" RS-232C command. 1 To clear the data on the hour meter (for the Panel) : CHM 2 To clear the data on the pulse meter : CPM 3 To clear the data on the SD history : CSD 4 To clear the data on the PD history : CPD
E
Using the Factory Menu See "7.1.7 HOW TO CLEAR HISTORY DATA."
F
PDP-436PE
5 6 7 8
57
|
|
 |
> |
|