|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
got exactly what i ordered in a very timely manner. will use again for other manuals
 ;
I'm happy. Good quality. Very helped me with my work..............................
 ;
This is the second Manual I have ordered from owner-manuals, I give it five stars because it is exactly what I expected given the age of the equipment. So the contents look a bit aged and the pictures a bit grainy, it fulfills my needs and I am glad I can still get hold of them.
 ;
thank u so much for this manual that was so cheap that i thought it was a scam but i gambled anyway because it was too good of a deal to pass up and behold,the manual has everything and details of everything even the screws and im still amazed and very happy with my manual .so take my word and jump on it before they realize how cheap they selling thier manuals..thank you so much for taking time to read my thoughts
 ;
I do not have very much to say.
The price is quite covenient, delivery was better as promised (about 12 ours, against the specified 24 hours if I remember well), and the quality of the PDF is more than acceptable.
The Service Manual of Sansui R30 itself is also satisfactory: good graphic for schematics and layouts, simple and well structured.
Giovanni Bianchi
2-2-6. Adjustment for the Power Board When the Panel is Replaced
2-3-2. Notes
(1) Without any special specification, the Module should be at the condition of preliminaries more than 10 minutes before adjusting. . Service signal : 100% Full White signal . Service DC voltage : Vcc : 5 V, Va : 65 V, Vs : 190 V . DC/DC Pack voltage : Vsetup : 220 V, Vscw : 115 V, _Ve : _35 V, _Vy : _75 V . Preliminaries environment : Temp (25 ± 5°C), Relative humidity (65 ± 10%) (2) Module should get the Aging for the equilibrium after finish the assembling. Aging condition is shown below. . Service signal : 100% Full White, Red, Green, Blue pattern signal (Service time of each pattern : within 5 minutes/cycle) . Service DC voltage : Match the voltage with the set up voltage in the first adjustment. . Aging time : More than 4 Hrs . Aging environment : Temp (60 ± 2°C), relative humidity-Less than 75% (3) Module adjustment should be followed by below sequence. . Setting up the initial voltage and adjusting the voltage wave form of Vsetup . Measuring the Margin of Vs voltage and deciding the voltage . Adjusting and checking the voltage of DC/DC pack (Vsetup, Vscw, _Ve, _Vy) . Adjusting the voltage wave form of Vset-down . Measuring the voltage margin of Vset-up and deciding the voltage . Adjusting the wave form of final voltage But, these items above can be changed by the consideration of mass production. (4) Without any special specification, you should adjust the Module in the environment of Temp (25 ± 5°C) and Relative humidity (65 ± 10%) c If you let the still image more than 10 minutes (especially The Digital pattern or Cross Hatch Pattern which has clear gradation), after image can be presented in the black level part of screen.
The label shown in the picture above is stuck on the upper right position at the back side of the panel, on which the Va and Vs voltages for each panel are described.
Vs adjusting VR Va adjusting VR
The Vs and Va adjusting VRs are located at around the center part of the power board as shown in the picture. After replacing the panel, adjust each VR so that it becomes the voltage described in the above label (± 0.5 V). Voltage measurement is performed between pin 1 of CN807 and chassis GND for Vs, and between pin 6 of CN807 and pin 10 of CN806 for Va.
2-3. Adjustment for Panel
2-3-1. Application Object
This standard is applied to the PDP42V5#### PDP Module which is manufactured by the manufacturing team of PDP promotion department or elsewhere.
PFM-42V1/42V1A/42V1E/42V1P
2-3
|
|
 |
> |
|