|
|
|
Categories
|
|
Information
|
|
Featured Product
|
|
|
 |
|
|
There are currently no product reviews.
 ;
This is a good quality scan of the Operation & Maintenance (Service) Manual for the PAL version of this high-band broadcast umatic, BVU-800P
All schematics and lineup procedures appear to be included in this one manual AFAICT.
The file size is just over 113 MB which gives an idea of the quality and number of pages.
All of the schematics, which contain some fairly small print, are easily readable when you zoom into the page.
John Thompson, Newcastle Upon Tyne, England.
 ;
Good quality, all schematics of few of models. There is also short form of user manual and regulation manual.
 ;
Perfect copy of the service manual. you can enlarge every page, and it comes up
with all details.
 ;
It´s very very nice manual with all, what i need. Original in good quality. Very fast business. Very much thanks...
 ;
Purchased the manual that I was looking for at a great price and could download it easily.. Great service experience and for future purchases I plan to use the site.
Thank you very much
1-6. Installation of the Optional Board
4. Turn the board levers in the direction of the arrow 1 after inserting the board to the end of the slot by hand.
Rear side n 1. Save the removed blank panel for later use. 2. Always attach the IFB shield parts attached to both sides of the blank panel, since they are the parts that use spurious radiation. 3. In order to maintain the cooling effect for the main unit, do not leave the slot open. Be sure to attach a blank panel to an empty slot. The connector panel attachment methods are divided into three types, depending on the slot number.
1
2
<Type 1> For slot No. 1 <Type 2> For slot Nos. 2 to 6, 9 to 14 <Type 3> For slot Nos. 7, 8
2 1 2 Board lever 1
The attachment methods for each type are explained below.
1
<Type 1> 1. Remove the five screws, and remove the IFB shield L, the IFB shield and the blank panel.
2 Board lever
1 Insert 2 Remove
5. Stick the slot label supplied with the optional board onto the board lever. 6. Install the board retainers. 7. Install the front panel. n When removing the board, turn the board levers in the direction of the arrow 2, and pull out the board toward you.
Blank panel IFB shield
PWH 3x6
PWH 3x6
PWH 3x6 IFB shield L
PFV-HD300 MM
1-5 (E)
|
|
 |
> |
|