|
There are currently no product reviews.
 ;
Very nice and real Service Manual, I didn't thought it actually exist in the real world at all.
 ;
VERY NICE FOR COURTESY AND PRECISION!.
tHE SITE IS VERY IMPORTANT FOR ALL DEVICES
vERY GOOD
 ;
+++ Is is fine, that was what i looking for. Thanks! +++
 ;
A very good complete archive, i am very satisfied for document.
 ;
The Service Manual received was helpful. The electronic information is exactly what I needed.
1
2
3
4
- Bonding Position
A
Make come near C888 and C887 and them apply bond from the top. 35 pts : GEM1017 3 pts : GYL1006
Hold here.
B
Hold here.
C
D
2 : Apply bond : the bond must not flow into screw hole.(C8,C9)
3 pts BOND LOCK 35 pts Capacitor
Press the thermistor against the transformer and apply an adhesive as the end of the thermistor touches the transformer.
Adhesive
E
Press
*Bond should be applied both of parts and PCB. *Be aware not to apply bond on contact point of connector, seat area of screw.
* TACK-FREE TIME 10 minutes
* TACK-FREE TIME 5 minutes
Note) When applying bond to two Film Capacitors (C887 and C888) , attach them and apply bond.
F
16
PRS-D1200SPL/XU/UC
1 2 3 4
|