|
There are currently no product reviews.
 ;
Very good expirience with owner-manuals.com.
5 Stars; In future if necessary, i´ll download manuals on this site.
 ;
Hi - happy with what I received but not quite what I wanted - my fault I assumed that service manual would also include operational instructions which is what I needed - all I needed to know was how to turn the radio - thanks
 ;
this Manual very important when i buy this Manual i already fix the trouble of my Camera..... thanks keep up the good work.!
 ;
This service manual helped me to repair my PIONEER. Iam very satisfied, that I found it here.
Even the price of manual was not so high that person would not be able to spend a few money.
But that is very worth spent money. Thanks
 ;
Excellent quality service manual. Quick processing, fair prices. Love to do business again. Thank you!!!
1
2
3
4
- Bonding Position
A
Make come near C888 and C887 and them apply bond from the top. 35 pts : GEM1017 3 pts : GYL1006
Hold here.
B
Hold here.
C
D
2 : Apply bond : the bond must not flow into screw hole.(C8,C9)
3 pts BOND LOCK 35 pts Capacitor
Press the thermistor against the transformer and apply an adhesive as the end of the thermistor touches the transformer.
Adhesive
E
Press
*Bond should be applied both of parts and PCB. *Be aware not to apply bond on contact point of connector, seat area of screw.
* TACK-FREE TIME 10 minutes
* TACK-FREE TIME 5 minutes
Note) When applying bond to two Film Capacitors (C887 and C888) , attach them and apply bond.
F
16
PRS-D1200SPL/XU/UC
1 2 3 4
|