|
There are currently no product reviews.
 ;
Very,very good manual.It was very explicit and readble.It was helpfull.Thanks.
 ;
The service manual is scanned, but high quality, high resolution. The smallest texts on schematics diagram is readable. Super! Thank you!
 ;
I am satisfied with the service. And if need another manual, i will definitely buy from this site. Keep up the good work.
 ;
have download a number of manuals todate , most are excellant, one or two sometimes a little difficult to read but a least avaialable, great site .
Brad.
 ;
Excellent had everything I wanted, very happy with purchase
and unplugged AC Plug. Installation of Front Panel Ass'y
CAUTION:
Opener Lever may be damaged when Front Panel Ass'y is installed, with Cassette Door-Lid of Front Panel Ass'y and Opener Lever of Cassette Up Ass'y set incorrectly. A. When installing the Front Panel Ass�y, swing the Cassette Door-Lid all the way open until the Cassette Door tab clears the Opener Lever. B. Make sure that all locking tabs are aligned properly. Then, press the Front Panel straight in.
Fig. D3
3. Installation of VCR Chassis Unit When installing 2 Screws (515), slide the Holder Unit of the Cassette Up Ass'y (Refer to "WHEN LOADING WITHOUT A CASSETTE" in Service Notes) to tighten screws. Then, slide it back to the EJECT Position. 4. Removal of DVD Sub C.B.A. A. Remove solder portions "a," "b," and "c" on the DVD Sub C.B.A. B. Remove the DVD Sub C.B.A. while releasing the Locking Tab. Installation of DVD Main C.B.A. and DVD Sub C.B.A. A. Confirm that the Lever A is positioned as shown, and install the DVD Sub C.B.A. with the Locking Tab and 2 bosses.
24
|